Park Introduction

In Japanese, "the water of the channel" means running water. Beigang channel is generally known as the Beigang running water. This channel was completed on May 31, 1930, and its source water is from Beigang river. The hydraulic engineering included water collecting well, water treatment plant, water tank, pump buildings, and a water transmission mains. This project is estimated to require 218 thousand 6 hundred Yen of the funds.

The completion of Beigang Water Channel was once known as the most advanced and the most complete facility in Beigang at that time. The channel had served the residents for 70 years. However, due to the water pollution, it was completely blocked up on October 2nd, 1997 Nevertheless, after the reparation in 2017, the water collecting well was transformed into a visitor center, and the function of the Beigang Water Channel was also transformed from water collection and water supply to leisure and tourism.

© 2020 北港水道頭文化園區。 雲林縣北港鎮民生路1號
Webnode 提供技術支援
免費建立您的網站! 此網站是在 Webnode 上建立的。今天開始免費建立您的個人網站 立即開始