Pump Well

The pump well sits next to the pump buildings. There are two large wells with 3 meters in diameter and 7 meters in depth.

  1. The first pump well: take the water from the water intake of Beigang River, and then use pipes to distribute the water to the first pump well.
  2. The second pump well: pump the clean water to the water collecting well with the pump and a heavy oil engine.

The water was pumped from Beigang river to the first station by the first pumping, after the pressurization by the pumping, the water was distributed to the sedimentation basin, and then purified in the filtering basin with the bevel brick and filtering sand. There is a oblong catch basin in the basin to collect the filtered water. This process takes about 4 to 7 days.

© 2020 北港水道頭文化園區。 雲林縣北港鎮民生路1號
由 Webnode 提供技術支援
BUILT WITH WEBNODE Like this website? Yours can be live today. Like this website? Yours can be live today. Describe your idea, AI builds the first draft. No code, free to start.